Submittals Made Simple

Simplify your submittal process with GAF
Prepare for your next construction project more efficiently using our new submittals made simple option - created specifically for professionals. Our packages contain the documents and specs you need for GAF’s most popular systems: a CSI–formatted Guide Specification, Product and Safety Data Sheets, a Sample Guarantee, and Details. Browse our systems below to download, email, or print all of your required materials in just a few clicks.

DOWNLOAD GUIDE
5 Simple Steps


1.    
Use our Selection Guide or browse this page to select your best package.

 

2.    Download and review the prepared documents.


3.    
Use as-is or edit as desired. Multiple product options appear in red throughout the spec and can be deleted if not appropriate.


4.    
Remove product data and safety data sheets for omitted products.


5.    
Submit the package by print or email as required.

EverGuard® TPO

60 Mil TPO, Insulated, 
New Construction or Tear Off

• Wood or Steel Deck
• 2 Layers of Insulation
      Layer 1 - ISO
      Layer 2 - ISO or HD ISO
• 20 yr NDL Guarantee
• Master or Master Select Contractor

promo card

60 Mil Fleece-Back TPO,
Non-Insulated,
New Construction or Tear Off

• Concrete Deck
• 20 yr NDL Guarantee
• Master or Master Select Contractor



GET DOCUMENTS

60 Mil TPO, Insulation, Recover

• Existing Substrate
• Insulation
      HD ISO
• 20 yr NDL Guarantee
• Master or Master Select Contractor


GET DOCUMENTS

60 Mil TPO, Insulation,
New Construction or Tear Off

• Wood or Steel Deck
• 2 Layers of Insulation
      Layer 1 - ISO
      Layer 2 - ISO
• 20 yr NDL Guarantee
• Master or Master Select Contractor

GET DOCUMENTS

60 Mil Fleece-Back TPO,
Non-Insulated, Recover

Existing Substrate
• 20 yr NDL Guarantee
• Master or Master Select Contractor



GET DOCUMENTS

60 Mil TPO, Insulated, Recover

Existing Substrate
• Insulation
    ○ HD ISO

• 20 yr NDL Guarantee
• Master or Master Select Contractor


GET DOCUMENTS

60 Mil TPO, Insulated,
New Construction or Tear Off

•  Existing Substrate
•  Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO

•  20 yr NDL Guarantee
•  Master or Master Select Contractor


GET DOCUMENTS

60 Mil TPO, Insulated,
Metal Retrofit

•  Metal Retrofit
•  Insulation
    ○  Layer 1 - Flute Fill ISO
    ○  Layer 2 - ISO

•  20 yr NDL Guarantee
•  Master or Master Select Contractor


GET DOCUMENTS

60 Mil TPO, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO

•  20 yr NDL Guarantee
•  Master or Master Select Contractor



GET DOCUMENTS

EverGuard Extreme® TPO

60 Mil Extreme TPO, Insulated,
New Construction or Tear Off

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO

•  30 yr NDL Guarantee
•  Master Select Contractor

GET DOCUMENTS

60 Mil Fleece-Back Extreme TPO, Non-Insulated,
New Construction or Tear Off

•  Concrete Deck
•  20 yr NDL Guarantee
•  Master or Master Select Contractor



GET DOCUMENTS

60 Mil Extreme TPO, Insulation, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

 

GET DOCUMENTS

60 Mil Extreme TPO, Insulation, New Construction or Tear Off

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO
•  25 yr NDL Guarantee
•  Master or Master Select Contractor

GET DOCUMENTS

60 Mil Fleece-Back Extreme TPO, Non-insulated, Recover

•  Existing Substrate
•  20 yr NDL Guarantee
•  Master or Master Select Contractor




GET DOCUMENTS

60 Mil Extreme TPO, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HDISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor




GET DOCUMENTS

60 Mil Extreme TPO, Insulated, New Construction or Tear Off

•  Wood or Steel Deck
•  Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO
•  30 yr NDL Guarantee
•  Master Select Contractor

GET DOCUMENTS

60 Mil Extreme TPO, Insulated, Metal Retrofit

•  Metal Retrofit
•  Insulation
    ○  Layer 1 - Flute Fill ISO
    ○  Layer 2 - ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

GET DOCUMENTS

60 Mil Extreme TPO, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor


GET DOCUMENTS

Everguard® PVC

60 Mil PVC, Insulated,
New Construction or Tear Off

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

GET DOCUMENTS

60 Mil fleece-back PVC,
Non-Insulated,
New Construction or Tear Off

•  Concrete Deck
•  20 yr NDL Guarantee
•  Master or Master Select Contractor


GET DOCUMENTS

60 Mil PVC, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor


GET DOCUMENTS

60 Mil PVC, Insulation,
New Construction or Tear Off 

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor
 

GET DOCUMENTS

60 Mil PVC, Non-Insulated, 
Recover 

•  Existing Substrate 
•  20 yr NDL Guarantee
•  Master or Master Select Contractor


GET DOCUMENTS

60 Mil PVC, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor  

GET DOCUMENTS

60 Mil PVC – Insulated – New Construction or Tear Off

•  Wood or Steel Deck
•  Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

GET DOCUMENTS

60 Mil PVC – Insulated – Metal Retrofit

•  Metal Retrofit
•  Insulation
    ○  Layer 1 - Flute Fill ISO
    ○  Layer 2 - ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

GET DOCUMENTS

60 Mil PVC – Insulated – Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

GET DOCUMENTS
LATEST FROM GAF ROOF VIEWS
Designing for Moisture Durability and Energy Efficiency, Part 2 Part 1 of our discussion of Designing for Moisture Durability and Energy Efficiency explored the driving forces that result in the increasing interactive complexity and tight coupling of roofs and other building systems in modern green buildings. Part 1 also provided an overview of the various project life-cycle phases and compared the top green rating system's scope to address or not address moisture durability in those phases.
How Designers & Super Crews Can Maximize Roofing EfficiencyThis case study looked at how a roof system designer, working with an expert crew, can both increase roofing efficiency and offer performance advantages to the building owner.
Ventilation for steep-slope roof assemblies is often misunderstood. One must not only understand the code requirements, but be able to translate them into real-world installations. Building codes have requirements for ventilation of steep-slope attics and enclosed rafter spaces. Balanced ventilation — nearly equal amounts of intake and exhaust — typcially provides efficient ventilation. Transitions between low-slope and steep-slope roof areas require more distinct intake and exhaust details than traditional eaves/soffits and ridges.
Thermal insulation is an important part of commercial roofing assemblies. The aim of this article is to examine the factors influencing the thermal resistance, known as R-value of polyiso. The prediction of long term R-value and the influence of climate, i.e. temperature, have been of significant interest over the past few decades as building energy budgets have increased in importance. Recent discussions as to what R-value the designer should use and the importance of ambient temperature are reviewed and discussed.

We're Here to Help

GAF Architectural Information Services is here to help answer questions, provide assistance
with master specification preparation and other valuable activities at no charge.

 Call us at 800-522-9224           Email us at AIS@gaf.com