Submittals Made Simple

Simplify your submittal process with GAF
Prepare for your next construction project more efficiently using our new submittals made simple option - created specifically for professionals. Our packages contain the documents and specs you need for GAF’s most popular systems: a CSI–formatted Guide Specification, Product and Safety Data Sheets, a Sample Guarantee, and Details. Browse our systems below to download, email, or print all of your required materials in just a few clicks.

DOWNLOAD GUIDE
5 Simple Steps


1.    
Use our Selection Guide, Roof Advisor Tool, or browse this page to select your best package.

 

2.    Download and review the prepared documents.


3.    
Use as-is or edit as desired. Multiple product options appear in red throughout the spec and can be deleted if not appropriate.


4.    
Remove product data and safety data sheets for omitted products.


5.    
Submit the package by print or email as required.

EverGuard® TPO

60 Mil TPO, Insulated, 
New Construction or Tear Off

• Wood or Steel Deck
• 2 Layers of Insulation
      Layer 1 - ISO
      Layer 2 - ISO or HD ISO
• 20 yr NDL Guarantee
• Master or Master Select Contractor

promo card

60 Mil Fleece-Back TPO,
Non-Insulated,
New Construction or Tear Off

• Concrete Deck
• 20 yr NDL Guarantee
• Master or Master Select Contractor



GET DOCUMENTS

60 Mil TPO, Insulation, Recover

• Existing Substrate
• Insulation
      HD ISO
• 20 yr NDL Guarantee
• Master or Master Select Contractor


GET DOCUMENTS

60 Mil TPO, Insulation,
New Construction or Tear Off

• Wood or Steel Deck
• 2 Layers of Insulation
      Layer 1 - ISO
      Layer 2 - ISO
• 20 yr NDL Guarantee
• Master or Master Select Contractor

GET DOCUMENTS

60 Mil Fleece-Back TPO,
Non-Insulated, Recover

Existing Substrate
• 20 yr NDL Guarantee
• Master or Master Select Contractor



GET DOCUMENTS

60 Mil TPO, Insulated, Recover

Existing Substrate
• Insulation
    ○ HD ISO

• 20 yr NDL Guarantee
• Master or Master Select Contractor


GET DOCUMENTS

60 Mil TPO, Insulated,
New Construction or Tear Off

•  Existing Substrate
•  Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO

•  20 yr NDL Guarantee
•  Master or Master Select Contractor


GET DOCUMENTS

60 Mil TPO, Insulated,
Metal Retrofit

•  Metal Retrofit
•  Insulation
    ○  Layer 1 - Flute Fill ISO
    ○  Layer 2 - ISO

•  20 yr NDL Guarantee
•  Master or Master Select Contractor


GET DOCUMENTS

60 Mil TPO, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO

•  20 yr NDL Guarantee
•  Master or Master Select Contractor



GET DOCUMENTS

EverGuard Extreme® TPO

60 Mil Extreme TPO, Insulated,
New Construction or Tear Off

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO

•  30 yr NDL Guarantee
•  Master Select Contractor

GET DOCUMENTS

60 Mil Fleece-Back Extreme TPO, Non-Insulated,
New Construction or Tear Off

•  Concrete Deck
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

 

60 Mil Extreme TPO, Insulation, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

 

GET DOCUMENTS

60 Mil Extreme TPO, Insulation, New Construction or Tear Off

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO
•  25 yr NDL Guarantee
•  Master or Master Select Contractor

 

60 Mil Fleece-Back Extreme TPO, Non-insulated, Recover

•  Existing Substrate
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

 

60 Mil Extreme TPO, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HDISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

 

60 Mil Extreme TPO, Insulated, New Construction or Tear Off

•  Wood or Steel Deck
•  Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO
•  30 yr NDL Guarantee
•  Master Select Contractor

GET DOCUMENTS

60 Mil Extreme TPO, Insulated, Metal Retrofit

•  Metal Retrofit
•  Insulation
    ○  Layer 1 - Flute Fill ISO
    ○  Layer 2 - ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

GET DOCUMENTS

60 Mil Extreme TPO, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor


GET DOCUMENTS

Everguard® PVC

60 Mil PVC, Insulated,
New Construction or Tear Off

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

GET DOCUMENTS

60 Mil fleece-back PVC,
Non-Insulated,
New Construction or Tear Off

•  Concrete Deck
•  20 yr NDL Guarantee
•  Master or Master Select Contractor


GET DOCUMENTS

60 Mil PVC, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor


GET DOCUMENTS

60 Mil PVC, Insulation,
New Construction or Tear Off 

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor
 

GET DOCUMENTS

60 Mil PVC, Non-Insulated, 
Recover 

•  Existing Substrate 
•  20 yr NDL Guarantee
•  Master or Master Select Contractor


GET DOCUMENTS

60 Mil PVC, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor  

GET DOCUMENTS

60 Mil PVC, Insulated, New Construction or Tear Off

•  Wood or Steel Deck
•  Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor


60 Mil PVC, Insulated, Metal Retrofit

•  Metal Retrofit
•  Insulation
    ○  Layer 1 - Flute Fill ISO
    ○  Layer 2 - ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor


60 Mil PVC, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor


We're Here to Help

GAF Architectural Information Services is here to help answer questions, provide assistance
with master specification preparation and other valuable activities at no charge.

Call us at 800-522-9224
Email us at AIS@gaf.com

 

LATEST FROM GAF ROOF VIEWS
What are the key material properties?In a previous article the use of thermal inertia to slow down heat flux through a roof assembly was discussed. In buildings where air conditioning costs dominate and heating use is relatively low, higher thermal inertia assemblies can potentially improve energy efficiency. This is particularly the case of buildings such as offices that are only occupied during daylight hours. Thermal inertia could delay the transmission of heat into a building towards the end of the day, increasing thermal comfort and allowing facility managers to reduce cooling during the day.
Thermal insulation is an important part of commercial roofing assemblies. As with anything, there are ways to design with and install polyiso insulation — a better way, a best way, and many variations in-between! What may be best in terms of lowest up-front costs, may prove only good or worse over the long-term life of the building.
Designing for Moisture Durability and Energy Efficiency, Part 2 Part 1 of our discussion of Designing for Moisture Durability and Energy Efficiency explored the driving forces that result in the increasing interactive complexity and tight coupling of roofs and other building systems in modern green buildings. Part 1 also provided an overview of the various project life-cycle phases and compared the top green rating system's scope to address or not address moisture durability in those phases.
How Designers & Super Crews Can Maximize Roofing EfficiencyThis case study looked at how a roof system designer, working with an expert crew, can both increase roofing efficiency and offer performance advantages to the building owner.