Submittals Made Simple

Simplify your submittal process with GAF
Prepare for your next construction project more efficiently using our new submittals made simple option - created specifically forprofessionals. Our packages contain the documents and specs you need for GAF’s most popularsystems: a CSI–formatted Guide Specification, Product and Safety Data Sheets, a Sample Guarantee, and Details. Browse our systems below to download, email, or print all of your required materials in just a few clicks.

5 Simple Steps


1.    
Use our Selection Guide, Roof Advisor Tool, or browse this page to select your best package.

 

2.    Download and review the prepared documents.


3.    
Use as-is or edit as desired. Multiple product options appear in red throughout the spec and can be deleted if not appropriate.


4.    
Remove product data and safety data sheets for omitted products.


5.    
Submit the package by print or email as required.

EverGuard® TPO

60 Mil TPO, Insulated, New Construction or Tear Off


• Wood or Steel Deck
• 2 Layers of Insulation
      Layer 1 - ISO
      Layer 2 - ISO or HD ISO
• 20 yr NDL Guarantee
• Master or Master Select Contractor

60 Mil Fleece-Back TPO, Non-Insulated,
New Construction or Tear Off

• Concrete Deck
• 20 yr NDL Guarantee
• Master or Master Select Contractor

60 Mil TPO, Insulation, Recover

• Existing Substrate
• Insulation
      HD ISO
• 20 yr NDL Guarantee
• Master or Master Select Contractor

60 Mil TPO, Insulation, New Construction or Tear Off

• Wood or Steel Deck
• 2 Layers of Insulation
      Layer 1 - ISO
      Layer 2 - ISO
• 20 yr NDL Guarantee
• Master or Master Select Contractor

60 Mil Fleece-Back TPO, Non-Insulated, Recover

Existing Substrate
• 20 yr NDL Guarantee
• Master or Master Select Contractor

60 Mil TPO, Insulated, Recover

Existing Substrate
• Insulation
    ○ HD ISO

• 20 yr NDL Guarantee
• Master or Master Select Contractor

60 Mil TPO, Insulated, New Construction or Tear Off

•  Existing Substrate
•  Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO

•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil TPO, Insulated, Metal Retrofit

•  Metal Retrofit
•  Insulation
    ○  Layer 1 - Flute Fill ISO
    ○  Layer 2 - ISO

•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil TPO, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO

•  20 yr NDL Guarantee
•  Master or Master Select Contractor

EverGuard Extreme® TPO

60 Mil Extreme TPO, Insulated, New Construction or Tear Off

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO

•  30 yr NDL Guarantee
•  Master Select Contractor

60 Mil Fleece-Back Extreme TPO, Non-Insulated, New Construction or Tear Off

 

•  Concrete Deck
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil Extreme TPO, Insulation, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil Extreme TPO, Insulation, New Construction or Tear Off

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO
•  25 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil Fleece-Back Extreme TPO, Non-insulated, Recover

•  Existing Substrate
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil Extreme TPO, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HDISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil Extreme TPO, Insulated, New Construction or Tear Off

•  Wood or Steel Deck
•  Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO
•  30 yr NDL Guarantee
•  Master Select Contractor

60 Mil Extreme TPO, Insulated, Metal Retrofit

•  Metal Retrofit
•  Insulation
    ○  Layer 1 - Flute Fill ISO
    ○  Layer 2 - ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil Extreme TPO, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

Everguard® PVC

60 Mil PVC, Insulated, New Construction or Tear Off

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil fleece-back PVC, Non-Insulated,
New Construction or Tear Off

•  Concrete Deck
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil PVC, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil PVC, Insulation, New Construction or Tear Off

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor
 

60 Mil PVC, Non-Insulated, Recover

•  Existing Substrate 
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil PVC, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil PVC, Insulated, New Construction or Tear Off

•  Wood or Steel Deck
•  Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil PVC, Insulated, Metal Retrofit

•  Metal Retrofit
•  Insulation
    ○  Layer 1 - Flute Fill ISO
    ○  Layer 2 - ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil PVC, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

Customized Submittal Packages
Don't see what you need in the prepared submittals packages above?  No problem.  GAF AIS prepares customized submittal packages with all the information you need to bid on your upcoming project.  Just complete the Specification & Submittal Request Form below, and we'll send electronic or hard-copy packages at no charge to you.

 

Low-Slope Submittal Form   Steep-Slope Submittal Form

We're Here to Help

GAF Architectural Information Services is here to help answer questions, provide assistance
with master specification preparation and other valuable activities at no charge.

Call us at 877-423-7663, option 4
Email us at AIS@gaf.com

 

LATEST FROM GAF ROOF VIEWS
This piece is co-written by Jennifer Keegan, AAIA. The headaches of Cold Storage facility operations extend beyond making sure the ice cream doesn't melt. Owners and Operators are regularly challenged with:
With the misinformation swirling around the topic of moisture in concrete roof decks, it can be difficult to know the right approach to take to mitigate risk. Are roof failures due to moisture in concrete primarily found in lightweight concrete decks? Do vented decks alleviate moisture in concrete by facilitating downward drying? Is 28 days the right amount of time to let a new concrete deck cure? Are admixtures and MVRA's (Moisture Vapor Reduction Additives) effective in mitigating concerns around moisture in concrete roof decks? Are vapor retarders the answer? What about vented base sheets? What adhesives and insulation and cover board facers are appropriate to use in these roof assemblies?
What are the key material properties?In a previous article the use of thermal inertia to slow down heat flux through a roof assembly was discussed. In buildings where air conditioning costs dominate and heating use is relatively low, higher thermal inertia assemblies can potentially improve energy efficiency. This is particularly the case of buildings such as offices that are only occupied during daylight hours. Thermal inertia could delay the transmission of heat into a building towards the end of the day, increasing thermal comfort and allowing facility managers to reduce cooling during the day.
Designing for Moisture Durability and Energy Efficiency, Part 2 Part 1 of our discussion of Designing for Moisture Durability and Energy Efficiency explored the driving forces that result in the increasing interactive complexity and tight coupling of roofs and other building systems in modern green buildings. Part 1 also provided an overview of the various project life-cycle phases and compared the top green rating system's scope to address or not address moisture durability in those phases.