
Drill-Tec #12 Purlin Fastener Data Sheet - 331
Data Sheets

The specially designed ¾” long pilot point prevents the existing metal roof panel from “jacking” up the threads during the drilling operation, thereby reducing point burnout and breakage.
Note: For detailed fastening instructions, please refer to the GAF Roofing/Attachment System Mini-Manual at gaf.com.Data Sheets
Data Sheets