A roofing company’s representative talking to homeowners in their living room about an upcoming project.

Call to Action Row with Video Left

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

FAQ Component Row 1

Lorem ipsum dolor sit amet



Pivot

Models 
 Compatible with the following:
Schedule 40
PVC, ABS, & Steel
Plumbing Vent Pipes

Pipe Inside Diameters

Pipe Height

Above Roof Deck
Pivot 1.5
PPBG1.5
Pivot Small
Combo - 1.5 & 2
PPBGSC

with 1.5" (38 mm) & 2"
(51 mm) Pipe
Inserts
 1.5"
(38 mm)




6" - 15"

(152 mm - 381 mm) 
Pivot 2
PPBG2
 2"
(51 mm)
Pivot 3
PPBG3
Pivot Large
Combo - 3 & 4
PPBGLC

with 3" (76 mm) &
4" (102 mm) Pipe
Inserts
3"
(76 mm)
Pivot 4
PPBG4
4"
(102 mm)

Comparison Table Row - Code deployment

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

  • Comparison Table Card 1

    Small Subheading

    Large Subheading

    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
  • Comparison Table Featured Card 1

    Small Subheading

    Large Subheading

    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud.
  • Comparison Table Card 2

    Small Subheading

    Large Subheading

    Lorem ipsum dolor sit amet, consectetur adipiscing elit.

FAQ Component Row

110 Turnpike Road Ste. 108
Westborough, MA 01815

763-439-2932
 110 Turnpike Road Ste. 108
Westborough, MA 01815
 110 Turnpike Road Ste. 108
Westborough, MA 01815

Accordion Row