Prepare for your next construction project more efficiently using our new submittals made simple option - created specifically for professionals. Our packages contain the documents and specs you need for GAF’s most popular systems: a CSI–formatted Guide Specification, Product and Safety Data Sheets, a Sample Guarantee, and Details. Browse our systems below to download, email, or print all of your required materials in just a few clicks.

5 Simple Steps


1.    
Use our Selection Guide, Roof Advisor Tool, or browse this page to select your best package.

 

2.    Download and review the prepared documents.


3.    
Use as-is or edit as desired. Multiple product options appear in red throughout the spec and can be deleted if not appropriate.


4.    
Remove product data and safety data sheets for omitted products.


5.    
Submit the package by print or email as required.

EverGuard® TPO

60 Mil TPO, Insulated, New Construction or Tear Off


• Wood or Steel Deck
• 2 Layers of Insulation
      Layer 1 - ISO
      Layer 2 - ISO or HD ISO
• 20 yr NDL Guarantee
• Master or Master Select Contractor

60 Mil Fleece-Back TPO, Non-Insulated,
New Construction or Tear Off

• Concrete Deck
• 20 yr NDL Guarantee
• Master or Master Select Contractor

60 Mil TPO, Insulation, Recover

• Existing Substrate
• Insulation
      HD ISO
• 20 yr NDL Guarantee
• Master or Master Select Contractor

60 Mil TPO, Insulation, New Construction or Tear Off

• Wood or Steel Deck
• 2 Layers of Insulation
      Layer 1 - ISO
      Layer 2 - ISO
• 20 yr NDL Guarantee
• Master or Master Select Contractor

60 Mil Fleece-Back TPO, Non-Insulated, Recover

Existing Substrate
• 20 yr NDL Guarantee
• Master or Master Select Contractor

60 Mil TPO, Insulated, Recover

Existing Substrate
• Insulation
    ○ HD ISO

• 20 yr NDL Guarantee
• Master or Master Select Contractor

60 Mil TPO, Insulated, New Construction or Tear Off

•  Existing Substrate
•  Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO

•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil TPO, Insulated, Metal Retrofit

•  Metal Retrofit
•  Insulation
    ○  Layer 1 - Flute Fill ISO
    ○  Layer 2 - ISO

•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil TPO, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO

•  20 yr NDL Guarantee
•  Master or Master Select Contractor

EverGuard Extreme® TPO

60 Mil Extreme TPO, Insulated, New Construction or Tear Off

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO

•  30 yr NDL Guarantee
•  Master Select Contractor

60 Mil Fleece-Back Extreme TPO, Non-Insulated, New Construction or Tear Off

 

•  Concrete Deck
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil Extreme TPO, Insulation, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil Extreme TPO, Insulation, New Construction or Tear Off

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO
•  25 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil Fleece-Back Extreme TPO, Non-insulated, Recover

•  Existing Substrate
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil Extreme TPO, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HDISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil Extreme TPO, Insulated, New Construction or Tear Off

•  Wood or Steel Deck
•  Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO
•  30 yr NDL Guarantee
•  Master Select Contractor

60 Mil Extreme TPO, Insulated, Metal Retrofit

•  Metal Retrofit
•  Insulation
    ○  Layer 1 - Flute Fill ISO
    ○  Layer 2 - ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil Extreme TPO, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

Everguard® PVC

60 Mil PVC, Insulated, New Construction or Tear Off

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil fleece-back PVC, Non-Insulated,
New Construction or Tear Off

•  Concrete Deck
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil PVC, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil PVC, Insulation, New Construction or Tear Off

•  Wood or Steel Deck
•  2 Layers of Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor
 

60 Mil PVC, Non-Insulated, Recover

•  Existing Substrate 
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil PVC, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil PVC, Insulated, New Construction or Tear Off

•  Wood or Steel Deck
•  Insulation
    ○  Layer 1 - ISO
    ○  Layer 2 - ISO or HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil PVC, Insulated, Metal Retrofit

•  Metal Retrofit
•  Insulation
    ○  Layer 1 - Flute Fill ISO
    ○  Layer 2 - ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

60 Mil PVC, Insulated, Recover

•  Existing Substrate
•  Insulation
    ○  HD ISO
•  20 yr NDL Guarantee
•  Master or Master Select Contractor

Customized Submittal Packages
Don't see what you need in the prepared submittals packages above?  No problem.  GAF Design Services prepares customized submittal packages with all the information you need to bid on your upcoming project.  Just complete the Specification & Submittal Request Form below, and we'll send electronic or hard-copy packages at no charge to you.

 

Low-Slope Submittal Form   Steep-Slope Submittal Form

We're Here to Help

GAF Design Services is here to help answer questions, assist with code requirements and submittal
packages, and provide other valuable solutions at no charge.

Call us at 877-423-7663, option 4, then option 3
Email us at designservices@gaf.com

 

LATEST FROM GAF ROOF VIEWS
During summer months, cities get hotter than surrounding areas. Trees and vegetation found in suburban and rural areas help reduce temperatures on sunny days. In contrast, tightly packed and tall city buildings tend to trap heat. To make matters worse, city buildings retain that heat and release it during the night due to their thermal mass.
Think that your roof doesn't need protection against hail? Think again. Severe hail events are increasing in geographic footprint and are no longer just in hail alley. The geographic region that experiences 1 inch or larger hailstones has expanded to be nearly two-thirds of the United States. Nearly 10 percent more U.S. properties, more than 6.8 million, were affected by hail in 2021 than in 2020. Coinciding with the increase in properties affected by a damaging hail event in 2021, there was also an increase in insurance claims, which rose to $16.5 billion from $14.2 billion in 2020.
Introduction We all recognize that, when properly installed, TPO can be part of a well performing roof system. However, a very simple error made during installation can set up the membrane for future issues. This has been known since early installations of TPO roofs but somehow it has been forgotten about by many installers. What are we talking about here? The use of adhesive buckets along a fold that causes premature cracking of the membrane years after installation. Let's dig deeper.
Architects strive to achieve a roof design that strikes a delicate balance between aesthetics and performance. Achieving high-performance means incorporating the code, warranty, and guarantee requirements that building owners must meet — among the most important factors of any construction project — into design vision. This isn't made any easier by the sheer number of roofing systems available. Even experienced architects can find it challenging to get familiar with all available components and positively identify which materials are going to deliver the ultimate protection for the building.