Drill-Tec Locking Impact Nail
For Attaching Base Ply, Recovery Board and Insulation to Cementitious Wood Fiber,
Poured Gypsum Decks, and LWIC (Light Weight Insulating Concrete).
Composition
Factory preassembled components consisting of:
- Tube: Precision formed from Galvanized (G-90) coated steel to prevent corrosion.
The tube is shaped to easily penetrate decking and existing membranes.
- Disk: Precision formed from Galvalume (AZ-55) coated steel to prevent corrosion.
Securely clamped to the tube, 2.7” diameter, rib reinforced to resist cupping.
- Locking Staple: Precision formed from high tensile steel wire. Coated to prevent
corrosion.
Technical Data
- Approvals: Factory Mutual and Metro-Dade County Approved.
Fastening Pattern: Consult Factory Mutual or Metro-Dade County requirements for
recommended patterns in normal, exposed, and hurricane areas.
- Field Testing: On-site withdrawal testing should always be performed to evaluate
the ability of the roofing substrate to satisfactorily accept and retain fasteners.
Such testing may alter fastener selection and modify applicable fastening patterns.
- The Locking Impact Nail should always be embedded into the structural roof deck
to a depth of at least 1”.
Installation
- Installation Tools: There are two tools that must be used to install the Locking
Impact Nail. The Locking Impact Nail Driver-BS is for installing base sheet and
recovery board to the substrate. For securing ISO or EPS to the substrate use the
Locking Impact Nail-IN, which has a larger impact area. Consult BMCA for the specific
driver for your application.
- Method: Drive fastener perpendicular to roof deck seating disk/plate flush with
roofing surface. Once tube is set, drive the locking staple thru the tube/disk unit
into the deck until the top of the staple is flush with the cap (see illustration).
- Operation: When locking staple is driven, its dual wire legs diverge anchoring the
fastener in place (see illustration). Uplift resistance may vary depending on the
density and integrity of the substrate.
- Packaging: 1.4”, 1.8”, 2.8”, and 3.8” Locking Impact Nails packaged 500 per carton.
4.8” Locking Impact Nails packaged 250 per carton.
Using the Drill-Tec Locking Impact Nail
Fastener density and spacing vary depending on applicable uplift requirements. Local
codes, governing approval bodies, membrane manufacturers, and individual roof deck
manufacturers all may have specific requirements that need to be addressed prior
to beginning any roofing project. The Locking Impact Nail should always be embedded
into the structural roof deck to a depth of at least 1”. The following illustrates
typical Factory Mutual recommended fastening patterns widely accepted by membrane
and roof deck manufacturers.
Fastening Guide 1
Base Ply Attachment for built-up or modified bitumen roof covers.
Class I-60, I-75, or I-90 Windstorm Classification. An FMRC Approved base ply is
fastened in the field of the roof with Locking Impact Nail installed 9” on center
in the 2” wide base ply side laps and 18” on center staggered in 2 rows, equally
spaced, between the base ply side laps. When fastening meter-wide material with
this pattern, expect to use approximately 86 fasteners per square (100 ft.2).
Fastening Guide 2
Recovery board and Insulation attachment under built-up and modified bitumen roof
covers. Class I-90 Windstorm Classification. An FMRC Approved Recovery Board/Insulation
suitable for use with minimum 3 ply built-up or modified membranes is attached with
8 Locking Impact Nail fasteners per 4’x 4’ board in a diamond-in-a-box pattern.
(1 fastener per 2 ft.2) Consult FMRC for a complete listing of approved recovery
boards/insulations.
Fastening Guide 3
Recovery board and insulation attachment under fully adhered single ply membranes.
Class I-90 Windstorm Classification. An FMRC Approved Recovery Board/Insulation
suitable for use with fully adhered single ply membranes is attached with 12 Locking
Impact Nail fasteners per 4’x 4’ board in 4 rows of 3 fasteners per row. (1 fastener
per 1.33 ft.2) Consult FMRC for a complete listing of approved recovery boards/insulations.
|